论文部分内容阅读
3月24~27日,水利部水利水电规划设计总院在陕西省韩城市对黄河甘泽坡水利枢纽可行性研究中间成果报告进行了审查。陕西省水利厅、山西省水利厅、水利部黄河水利委员会和黄委勘测规划设计研究院的代表40人参加了会议。甘泽坡水利枢纽位于黄河北干流下端,左岸为山西省河津市,右岸为陕西省韩城市,上距壶口瀑布58.7km,下距龙门水文站3.7km
March 24 ~ 27, Ministry of Water Resources Planning and Design Institute of Water Conservancy and Hydropower in Hancheng City, Shaanxi Province on the Yellow River Ganzepo Feasibility Study Interim Results Report was examined. 40 delegates from Shaanxi Provincial Department of Water Resources, Shanxi Provincial Department of Water Resources, Ministry of Water Resources Yellow River Conservancy Commission and Planning and Design Institute of the Yellow River Survey and Design Institute attended the meeting. Ganzepo Water Control Project is located in the lower reaches of the Yellow River North Mainstream, the left bank of Hejin City, Shanxi Province, on the right bank of Hancheng City, Shaanxi Province, on the Hukou Waterfall 58.7km, from the Longmen Hydrological Station 3.7km