论文部分内容阅读
一些矿床规模小,勘探程度较低的小矿,地质部门往往只提交普查报告,估算远景储量。按正常建设程序,这类小矿是缺乏建设条件的,但要求地质部门深入勘探时,则常因资金和勘探条件困难等原因而难以实现。 笔者认为,对于那些埋藏条件简单,交通方便,矿石品位较高,易于开采的矿床,利用地质普查报告也可进行建设,但在建设前必须由有经验的地质、采矿技术人员进行审议,确认可行后再按由小到大的原则进行方案设计。然后组织少量人员对资源相对可靠地段边开拓边勘探,摸清情况后,补充修改原方案,用少量工程尽快形成生产能力,
Some small-scale deposits, exploration of low-level small mines, geological departments often submit only census report, estimate long-term reserves. According to the normal construction procedures, such small mines are lack of construction conditions. However, when the geological departments are required to conduct in-depth exploration, they often find it difficult to realize such problems as capital and exploration conditions. I believe that for those buried conditions are simple, convenient transportation, ore grade higher, easy to mine deposits, the use of geological census report can also be carried out, but before the construction must be experienced geological and mining technicians to review to confirm the feasibility Then according to the principle of small to large design. And then organize a small number of personnel to open up the exploration side of the area where resources are relatively reliable and clarify the situation, supplement and amend the original plan, and form the production capacity as soon as possible with a few projects,