论文部分内容阅读
我厂今年已经提前两个月零十四天全面超额完成了全年国家计划。砖的质量合格率达到93.87%,比1962年提高28.5%,一级品率达到95.4%;单位成本比国家计划降低22.9%,比1962年同期降低31.44%;利润预计将比国家计划多上缴15万余元;全员劳动生产率比国家计划提高31.5%,比1962年提高49%;每万块砖煤耗比国家计划降低50公厅,到九月底已节约煤炭650吨,预计全年可节约800多吨。我
I plant this year already two months and fourteen days in advance fully over the year completed the national plan. The qualified rate of bricks reached 93.87%, up 28.5% over 1962 and the first class product rate reached 95.4%. The unit cost was 22.9% lower than that of the national plan and 31.44% lower than that of the same period of 1962. The profit is expected to surrender more than the national plan. Total labor productivity of 31.5% higher than the national plan, an increase of 49% over 1962; per hundred bricks coal consumption lower than the national plan of 50 public hall, by the end of September has saved 650 tons of coal is expected to save 800 More tons. I