论文部分内容阅读
在经济水平不断提升的条件下,我国加大力了基础设施建设力度,进而早日实现社会主义现代化建设。桥梁工程作为重要的工程,在工程建设过程中,为了避免国家的财产安全和人们的生命安全等受到侵害,在预制梁施工期间,人们对施工质量的控制予以高度重视。在市场日益激烈的环境下,工程企业为了提高市场竞争力,应当对影响施工质量的因素进行分析,然后对施工质量加以控制。因此,本文针对桥梁工程中预制梁的施工质量控制及影响,并提出了具体的控制措施,从而为提高桥梁工程质量奠定良好基础。
Under the condition of continuous improvement of economic level, China has stepped up efforts in infrastructural construction so as to realize the socialist modernization as soon as possible. As an important project, bridge engineering is paid great attention to the construction quality control during the construction of prefabricated beams in order to avoid the national property safety and people’s life safety from being infringed upon. In the increasingly fierce market environment, engineering enterprises in order to improve market competitiveness, should affect the construction quality of the factors that are analyzed, and then control the quality of construction. Therefore, this article aims at the construction quality control and influence of prefabricated beam in bridge engineering, and puts forward specific control measures, so as to lay a good foundation for improving the quality of bridge engineering.