东北电管局1990年完成发电量764.14亿 kW·h。其中,水电完成76亿 kW·h,比计划多发22亿 kW·h,节煤80万 t,比1989年增长72%。由于加强了水电调频工作,提高了电网的电能质量。全年周波合格率达99.87%,比1989年提高23.99%;水电起到事故备用作用。承担了电网的主调峰作务。当前,东北电网水、火电结构很不合理,所以,加快水电开发迫在眉睫,必须做好以下工作:1.深化改革,给予水电建设和管理以优惠政策;2.加强现有水电站的管理工作,使其在电网中充分发挥作用;3.加强水电队伍及生产运行队伍的建设。总之,要通过多种有效措施,加快水电建设,调整改革电网结构,为发展国民经济做出贡献。
Northeast Authority completed in 1990 76.414 billion kW · h power generation capacity. Among them, the hydropower completed 7.6 billion kW · h, more than the planned 2.2 billion kW · h, saving 800,000 tons, an increase of 72% over 1989. Due to the strengthening of the hydro-frequency control, improve the power quality of the grid. Annual pass rate of 99.87% Zhou, 23.99% higher than in 1989; utilities play a backup role. Undertake the main peak task of the grid. At present, the structure of water and thermal power in Northeast Power Grid is unreasonable. Therefore, it is imperative to accelerate the development of hydropower. The following work must be done: 1. Deepen the reform and give preferential policies to the construction and management of hydropower; 2. Strengthen the management of existing hydropower stations so that Its full play in the power grid; 3 to strengthen the hydropower team and production and operation of the team building. In short, through a variety of effective measures to speed up the construction of hydropower, adjust and reform the power grid structure, and make contributions to the development of the national economy.