论文部分内容阅读
本文从理论和实践的结合上阐述了本钢1700热连轧厂1号卷取机卷筒改造的设计思想和改造要点,对改造中几个关键问题进行了详细分析、探讨和理论计算,结合实际情况寻找出旧设备改造的最佳方案。
In this paper, the combination of theory and practice of the 1700 hot strip mill in Benxi Iron and Steel Company No. 1 coiler redesign of the design and transformation of the key points of the transformation of a number of key issues in detail analyzed and theoretical calculations, combined with The actual situation to find the best solution for the transformation of the old equipment.