论文部分内容阅读
我国2007年9月出台了《可再生能源中长期发展规划》,其中不仅提出了2010年500×104kW、2020年3000×104kW的风电发展目标,而且首次明确了配额概念,鼓励中国500×104kW以上的发电集团,在2010年除水电外,要拥有3%的可再生能源发电比例,2020年这一比例达到8%。直至2010年,我国风电新增装机容量1890×104kW,居世界第一;截至2010年底,我国风电总装机容量4470×104kW,居世界第一;共建成风电场800多个,建有亚洲首个100MW海上风电项目;具备大型风电场建设能力的开发商已经超过20家;具备兆瓦级风电机组批量生产能力的企业超过20家,4家企业2010年新增装机容量进
In September 2007, China issued the “Medium- and Long-Term Plan for Renewable Energy Development”, which not only put forward the wind power development target of 500 × 104kW in 2010 and 3000 × 104kW in 2020, but also clarified the concept of quota for the first time and encouraged China to have a capacity of more than 500 × 104kW Of the power generation group, in addition to hydropower in 2010, to have 3% of the proportion of renewable energy power generation, by 2020 this ratio reached 8%. Up to 2010, the installed capacity of wind power in our country has increased by 1890 × 104kW, ranking the first in the world. By the end of 2010, the total installed capacity of wind power in our country has reached 4470 × 104kW, ranking the first in the world. A total of more than 800 wind farms have been built and the first in Asia 100MW Offshore Wind Power Project; more than 20 developers have the capability to build large-scale wind farms; more than 20 enterprises have the capacity of producing megawatt-scale wind turbines; 4 enterprises added new installed capacity in 2010