论文部分内容阅读
望城公司部分配网线路运行年代久远,设备陈旧,频发故障。但是生产秩序和调度停电计划的管控,要求一条线路不能三天两头出现故障、停电并进行消缺。如何做到一次停电就把整条线路所有的“病”治好,是配网运行管理工作中的一个难题。2014年,望城公司由生产负责人牵头,集结运检部、配电班、配检队对全年跳闸在5次以上的配网线路开展了集中监察性巡视活动。按照线路停电整体消缺的原则,巡视人员分组、分杆段开展了地毯式隐患排查和缺陷收集。全年共对10千伏楠亚
Wangcheng part of the distribution network with long-running lines, outdated equipment, frequent failures. However, the production order and the regulation of power outages plan require that one line fail not to be damaged in three days and power outages should be eliminated. How to do a blackout put the entire line of all the “disease” cured, is the distribution network operation and management of a problem. In 2014, Wangcheng Company was led by the production supervisor and assembled the inspection and quarantine department, power distribution team and inspection team to conduct centralized inspection tour on the distribution network with more than 5 trips in the whole year. In accordance with the principle of overall power shortage and power outage, the inspectors grouped and carried out a sub-section of the carpet-based risk screening and defect collection. A total of 10 kilovolts Nan Ya