南阳滩水利枢纽为一综合利用工程,位于渠县境内,是渠江干流梯级开发中的第一个梯级。除拦河坝、船闸、水轮泵站已建成外,水电站正在建设中(封二照片1、2) 电站为河床式,位于右岸,由进水前池,侧堰,冲砂廊道,主、付厂房,交通、通风廊道,尾水渠和变电站等建筑物组成。主厂房为厂顶溢流式,轴线位于坝轴线下游61米处,内装四台2500千瓦灯泡贯流式机组,设计水头6.48米,单机引用流量51.6米~3/秒,装机年利用小时为6359小时,多年平均发电量6359万度。是目前我省较大的县办水电站之一。
Nanyangtan Water Control Project is a comprehensive utilization project, located in Quxian territory, is the first cascade in the development of the cascade river. In addition to the dam, ship lock, water pump station has been completed, the hydropower station is under construction (Photo 2 photos 1,2) power plant for the riverbed, located on the right bank, by the inflow pool, weir, red sand corridor, the main, pay Plant, traffic, ventilation corridors, tailings and substations and other buildings. The main plant for the plant roof overflow, the axis is located 61 meters downstream of the dam axis, built four 2500-kilowatt bulb tubular units, design head 6.48 meters, stand-alone reference traffic 51.6 m ~ 3 / sec, installed capacity of 6359 hours Hours, the average annual generating capacity of 63.59 million degrees. It is one of the larger county-level hydropower stations in our province.