Bridge Pressure Flow Scour at Clear Water Threshold Condition

来源 :Transactions of Tianjin University | 被引量 : 0次 | 上传用户:jyd965243
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Bridge pressure flow scour at clear water threshold condition is studied theoretically and experimentally.The flume experiments reveal that the measured scour profiles under a bridge are more or less 2-dimensional;all the measured scour profiles can be described by two similarity equations,where the horizontal distance is scaled by the deck width while the local scour by the maximum scour depth;the maximum scour position is located just under the bridge about 15% deck width from the downstream deck edge;the scour begins at about one deck width upstream the bridge while the deposition occurs at about 2.5 deck widths downstream the bridge;and the maximum scour depth decreases with increas-ing sediment size,but increases with deck inundation.The theoretical analysis shows that:bridge scour can be divided into three cases,i.e.downstream unsubmerged,partially submerged,and totally submerged.For downstream unsubmerged flows,the maximum bridge scour depth is an open-channel problem where the conventional methods in terms of critical velocity or bed shear stress can be applied;for partially and totally submerged flows,the equilibrium maximum scour depth can be described by a scour and an inundation similarity number,which has been confirmed by experiments with two decks and two sediment sizes.For application,a design and field evaluation procedure with examples is presented,including the maximum scour depth and scour profile. Bridge pressure flow scour at clear water threshold condition is studied theoretically and experimentally.The flume experiments reveal that the measured scour profiles under a bridge are more or less 2-dimensional; all the measured scour profiles can be described by two similarity equations, where the horizontal distance is scaled by the deck width while the local scour by the maximum scour depth; the maximum scour position is located just under the bridge about 15% deck width from the downstream deck edge; the scour begins at about one deck width upstream the bridge while the deposition occurs at about 2.5 deck widths downstream the bridge; and the maximum scour depth decreases with increas-ing sediment size, but increases with deck inundation. the theoretical analysis shows that: bridge scour can divided into three cases, iedownstream unsubmerged , partially submerged, and totally submerged. For the next unsubmerged flows, the maximum bridge scour depth is an open-channel problem where the conventional methods in terms of critical velocity or bed shear stress can be applied; for partially and totally submerged flows, the equilibrium maximum depth can be described by a scour and an inundation similarity number, which has been confirmed by experiments with two decks and two sediment sizes. For application, a design and field evaluation procedure with examples is presented, including the maximum scour depth and scour profile.
其他文献
本文认为,企业人力资产的确认与计量应与人力资源管理紧密结合,同时应将“区别考评制度”引入对企业人力资产的确认及对人力资源价值的计量中,并对原有个体和整体人力资源价
“The Beijing Area Study” (BAS) is a large-scale social investigation and research project planned and implemented by the Beijing University Research Centre f
涅槃,佛教用语,意义是指清凉寂静,恼烦不现,众苦永寂;具有不生不灭、不垢不净、不增不减,远离一异、生灭、常断、俱不俱等等的中道体性意义;也即成佛。佛教认为,轮回是一个必
本文研究了滑差率对20C_r,M_nT_i钢碳氮共渗接触疲劳性能及损伤方式的影响,结果表明,当滑差率由5%增加至20%时,其接触疲劳寿命大幅度下降,而且,载荷越大,其下降的幅度越大,其损
探讨了中碳非调质钢的强化机构与显微组织间的关系。测定了显微组织参数,观察并分析了沉淀物的形态及其结构。结构表明,加入微量钒的中碳非调质钢热加工后的空冷组织,是由先
来自多伦多病童医院和加州大学洛杉矶分校的科学家首次查明了大脑中负责储存和恢复陈旧记忆的一块区域。该研究发现发表在近期出版的《科学》 For the first time, scienti
公共交往可以作为学校公民教育实践的途径与策略选择,两者之间具有契合性。本文基于公共交往与学校公民教育实践的关系,分析了公共交往视角下学校公民教育实践的价值取向,并
在过去几年里,我厂加工和装配车间曾先后发生过几起由于洗涤汽油产生静电而引起的火灾,使人体烧伤,设备受损,造成上万元的经济损失。着火的原因是由于汽油静电积聚到一定程
到目前为止,对于淬火、淬火并回火态钢的奥氏体晶粒显示,已有较多的文献报导,而对于球化退火态钢的奥氏体品粒显示,尚未见报导。这里介绍一种多用途奥氏体晶粒腐蚀荆“M1”
判别工艺装备或设备能否满足产品质量要求,一般采用统计分析方法进行验证。工艺验证中,无论是稳定过程还是不稳定过程统计检验,都会遇到工艺系统精度检查中出现的、且易忽视