论文部分内容阅读
对本钢新1号高炉(4747m3)年修后炉况失常恢复进行了评述,分析总结了炉况失常的原因和此次恢复的经验,并提出了今后的操作设想。
This paper reviews the furnace failure recovery after the annual repair of the new No. 1 blast furnace (4747m3), analyzes and summarizes the causes of the furnace failure and the experience of the recovery, and puts forward the future operational plans.