麦克纳瑞(McNary)坝的设计和建设中的一个复杂问题是为被阻于河道的鱼类建造合适的通道。为建造这条供鱼上溯的通道,不仅要增加投资,以后还需花费运转和养护的费用。麦克纳瑞坝的过鱼设施系仿照邦维尔(Bonneville)坝的过鱼设施并进行适当修改和参考该坝所收集和研究的有用资料而兴建的。邦维尔坝已有十年左右的运行经验。本文论述了麦克纳瑞坝的过鱼设施,讨论了设计目的,简述了建设和运转中的问题,以及讨论了进一步改善设计的可能性。
A complex problem in the design and construction of the McNary dam is the construction of suitable access to the fish blocked by the river. In order to build this tunnel for fish supply, we not only need to increase our investment but also spend on running and maintenance in the future. McNarry’s over-fishing facility was modeled after the Bonneville Dam’s over-fishing facility and was modified as appropriate and referenced to useful information collected and studied by the dam. The Bonville Dam has been operating for about a decade. This article discusses McNarry Dam’s over-fishing facility, discusses the design goals, briefly describes the issues in construction and operation, and discusses the possibilities for further improvement.