论文部分内容阅读
我国的烧结厂大多是五十年代和六十年代末期建成投产的。目前,全国烧结机总有效面积大约为6580M~2,装机面积多在18~130M~2之间。由于原料条件和设备状况千差万别,生产技术经济指标也很不相同。但是,和国外现代化烧结厂相比,即使较先进的烧结厂,也有着不小的差距。仅以一九七九年我国部分重点烧结厂的生产指标与日本部分烧结厂相比较,如表1所示,无论是在烧结矿的产量、质量、设备作业率和能量消耗等方面,我们都是处于
Most of our sintering plants are completed and put into operation in the 1950s and the late 1960s. At present, the total effective area of the sintering machine is about 6580M ~ 2, and the installed area is more than 18 ~ 130M ~ 2. As raw materials conditions and equipment vary widely, the technical indicators of production and economy are also very different. However, compared with foreign modern sinter plants, even the more advanced sinter plants, there is also a big gap. Only by comparing the production targets of some of China’s key sintering plants in 1979 with those of some of Japan’s sintering plants, as shown in Table 1, both of our production output, quality, equipment operating rate and energy consumption Is at