论文部分内容阅读
东平湖水库是黄河下游防洪的重要工程之一,有五座大型进湖闸。为防止闸室淤积和闸门漏水,建成以后,均在闸前铺盖上修做了围堰。其中,林辛进湖闸闸前围堰长175.3m,顶部高程49.1m(大沽,下同),背河坡脚距闸墩约10m,临河坡脚以外滩面宽50m;十里堡进湖闸闸前围堰长366m,顶高程48.5m,背河坡脚距闸墩80~140m,临河坡脚以外滩
Dongpinghu reservoir is one of the important flood control projects in the lower reaches of the Yellow River, there are five large into the lake gate. In order to prevent siltation of sluice chamber and leakage of gate, after the completion of the sluice, the cofferdams were covered and repaired before the sluice. Among them, Lin Xinjin Lake sluice front cofferdam length 175.3m, the top elevation of 49.1m (Dagu, the same below), the distance from the foot of the ditch Creek pier about 10m, Linhe slope outside the foot of the beach 50m wide; Shilipu into the lake Gate before the cofferdam 366m, the top elevation 48.5m, back to the river from the pier pier 80 ~ 140m, Lin Po slope to the Bund