国家建委一○一工程指挥部施工团广大职工,遵照毛主席“打破洋框框,走自己工业发展道路”的伟大教导,三个石方连队发扬了艰苦奋斗,自力更生的革命精神,在洞库衬砌施工中,克服了很多技术难关,如开挖边墙排水措施等。现将某洞库开挖边墙排水措施介绍如下:黔北基地地下厂房,因工艺需要,防水要求甚高,而我们所承担的三个洞库工程,
According to the great teachings of Chairman Mao’s “breaking the foreign framework and taking the path of its own industrial development”, the three stone company companies carried forward the revolutionary spirit of hard struggle and self-reliance in the hole. In the lining construction of the warehouse, many technical difficulties are overcome, such as drainage measures for excavating side walls. The drainage measures for excavating the side wall of a cavern are now described as follows: The underground powerhouse of the Oubei base, due to process needs, has a high requirement for waterproofing, and we have undertaken three hole storage projects.