论文部分内容阅读
舟山发电厂125MW机组的除氧器水位和凝汽器水位自动控制,由于两水位的藕合问题一直无法很好的解决,致使自动控制不能长期投运。本文采用了系统水位的概念,解决了这一问题。
Zhoushan Power Plant 125MW unit deaerator water level and automatic control of the condenser water level, because the two water level coupling has been unable to solve the problem, resulting in automatic control can not be put into operation for a long time. This article uses the concept of system water level to solve this problem.