论文部分内容阅读
1982年《矿工》无烟煤生产联合公司超出计划采出的煤炭达44万8千吨,劳动生产率计划完成了108.9%,劳动生产率的增长任务完成107.7%。煤炭产量增加了70万3千吨,劳动生产率增加了9.3%,这一增长是依靠采取下述的措施实现的:首先提高回采作业的机械化和自动化程度(综采工作面采出的煤炭为182万9千吨,比1981年增加了51万
In 1982, the miner’s anthracite coal production company exceeded the planned coal production by 448,000 tons, the labor productivity plan completed 108.9% and the labor productivity growth task accomplished 107.7%. Coal production increased by 703,000 tons and labor productivity increased by 9.3%. The increase was achieved through the following measures: Firstly, the mechanization and automation of recovery operations should be enhanced (the coal recovered from fully mechanized coal mining works is 182 Nine thousand tons, an increase of 510,000 over 1981