对白山发电厂 30 0MW机组在起动或停机过程中 ,风闸起落不灵活 ,个别风闸发卡 ,造成故障原因进行了分析 ,并介绍改造方案及措施
During the start-up or shutdown of Baishan Power Plant, the unbalanced wind-up and landing of wind-driven gates and the issuance of individual wind-gates resulted in the analysis of the causes of the failures and the introduction of the transformation plans and measures