对凌钢2 300m3高炉长期非计划休风的处理进行总结。主要经验是在高炉休风后采取保温措施;复风后加入适量净焦,多补充喷煤量,使用最高风温等强提炉温;降低炉渣碱度,改善炉渣流动性;适度调整矿批,合理调整布料矩阵,保证两股煤气流合理分布;分级式堵风口和安排合理的炉前作业等措施,复风24h后炉况就基本恢复正常。
Summarize the long-term unplanned break-off treatment of 2 300m3 BF in Linggang. The main experience is to take the insulation measures after the wind break in the blast furnace; after adding the wind, add the appropriate amount of net coke, add the amount of coal injected, and use the maximum air temperature to raise the furnace temperature; lower the slag alkalinity and improve the slag fluidity; , Reasonably adjust the fabric matrix to ensure that the two coal gas streams are properly distributed; and the graded plug air outlets and reasonable arrangements for the furnace operation are arranged. After 24 hours of re-airing, the furnace conditions basically return to normal.