近几年在冶金矿山,KD-100型钻机用于坑内金刚石钻进已越来越多,交流这方面的操作技术和孔内故障处理经验很有必要. 安装技术1.硐室规格:长5.5米,高2.2米,宽2.2米. 2.安装钻机前要处理顶板松石,清理底板废碴,钻机各部件加油,检查辅助设备是否完好,确保安全、文明生产. 3.为了方便操作,风压开关安装高度1.5米,操作盘(手轮)安装高度0.95米,钻机与掘进方向的岩壁间距为0.8~1米.
In recent years, metallurgical mines, KD-100 type drilling rig for drilling more and more holes in the pit, the exchange of operating skills and hole handling experience is necessary. Installation Technology 1. Chamber Specifications: Length 5.5 Meters, 2.2 meters high and 2.2 meters wide 2. Before installation of drilling rig to deal with the top turquoise, cleaning the floor scraps, drilling rig refueling, check the auxiliary equipment is intact, to ensure safe and civilized production. 3. For the convenience of operation, wind pressure Switch installation height of 1.5 meters, operation panel (hand wheel) installation height of 0.95 meters, drilling and drilling direction of the rock wall spacing of 0.8 to 1 meter.