我省于四月二十六日至四月二十九日在东沙埠(代表吊船过河纜站)、新昌(代表纜道站)水文站召开了基本設施整頓、补課、驗收現場会議。到会的有各分站站长和負責整頓驗收工作的同志共14人。 会前,由总站、分站派員会同两測站同志一起根据规定要求,进行了认真的补課、驗收工作,并对測具的改进、配套等方面进行了研究与試制。
From April 26 to April 29, the province held a site meeting on basic facilities remediation, make-up and acceptance at the Dongsha Port (on behalf of the gondola crossing the river cable station) and Xinchang (on behalf of the cable channel station) hydrological station . At the meeting, there are 14 sub-station chiefs and comrades responsible for rectifying and checking work. Before the meeting, the headquarters and sub-station dispatchers carried out serious remedial and acceptance work along with the comrades of the two stations according to the requirements of the survey and conducted research and trial production on the improvement and matching of the measuring tools.