论文部分内容阅读
多年来钢筋混凝土结构的施工一直沿用陈旧的木模现浇施工法。现场模板成堆,木方成林,消耗着大量的木材和劳动力。在毛主席无产阶级革命路线指引下,我公司广大职工最近几年来,开始成功地使用了液压滑动模板新工艺。一九六八年在公司党委的领导下,在建字02部队的协助下,我们首先在化肥厂造粒塔混凝土筒仓结构中,使用液压滑动模板新工艺,效果较好。七○年在化肥厂的包装间混凝土框架结
Over the years, the construction of reinforced concrete structures has been using old cast-in-place construction methods. Site templates are piled up, wooden trees form a forest, and consume a lot of wood and labor. Under the guidance of Chairman Mao’s proletarian revolutionary line, the majority of employees of our company have successfully used the new technology of hydraulic sliding formwork in recent years. In 1968, under the leadership of the company’s party committee, with the help of the Jianzi 02 force, we first used a new technique of hydraulic sliding formwork in the concrete silo structure of the fertilizer plant granulation tower with good results. Seventy-five in the fertilizer plant packaging room concrete frame knot