论文部分内容阅读
针对长青壹号项目在5台塔吊同时施工作业时,塔机起重臂存在交叉现象,易发生塔吊碰撞事故的问题,分析预判了群塔施工作业可能发生碰撞的情形,并制定了塔吊防碰撞施工管理措施,保障了群塔施工作业的安全。
For the construction of No. 5 crane at the same time in Changqing No. 1 project, the cross boom of the tower crane is crossed and the collision of crane with crane is liable to occur, and the possible collision of the tower crane may be analyzed and forecasted. A crane Anti-collision construction management measures to protect the safety of group tower construction operations.