论文部分内容阅读
背景资料:东方汽轮机厂位于成都平原西北部,号称“天下第64福地”的绵竹市汉旺古镇,是一座花园式的现代化省级文明单位,是我国研究、设计、制造大型电站汽轮机的骨干企业之一,也是大型海军舰用动力主、辅机定点生产厂家,是国家计划单列的中国东方电气集团紧密成员单位。工厂始建于1966年,1971年生产第一台汽轮机,1974年通过国家基建验收。东汽厂由汉旺厂区和德阳厂区组成。汉旺厂区为工厂的主厂区,位于四川省绵竹市汉旺镇,离绵竹市区13公里,离德阳市区42公里,距成都市110公里。德阳厂区位于德阳市内。目前成都至德阳的高速公路已经建成,德阳至汉旺建有一级公路,还有铁路专用线直通厂区,交通运输方便。工厂现有职工8111人,其中工程技术人员1079人。全厂占地面积136.08万平方米,其中厂区占地面积80.36万平方米,生产建筑面积30.77万平方米。工厂拥有主要生产设备2377台,其中进口设备136台,数控设备46台。工厂严格采用ISO和IEC国际标准,为国家一级计量企业,通过了GB/T19001《质量体系设计、开发、生产、安装和服务的质量保证模式》标准认证;通过了核电质量保证体系的审核和GEC-AL-STOM公司的质量审核;1997年1月通过了关国ASME总部对工厂的ASME联检,取得了ASME“U”钢印及授权证书。工厂经过三十多年的不懈努力,电站汽轮机生产能力已从建厂的600MW发展到1998年的3350MW。工厂自主开发的300MW汽轮机经过多次优化、改进,其性能指标已接近国际
Background information: Dongfang Steam Turbine Plant is located in the northwestern part of Chengdu Plain, known as “world No. 64 Blessed ” Han Town, Mianzhu City, is a modern garden-style provincial civilized unit, is China’s research, design, manufacture of large-scale power station steam turbine One of the key enterprises, but also large-scale naval ship power main and auxiliary aircraft sentinel manufacturers, is the state plan separate close China Eastern Electric Group members. The factory was founded in 1966, the first turbine was produced in 1971 and passed the state infrastructure inspection in 1974. East steam plant from Han Wang plant and Deyang plant components. Hanwang plant for the factory’s main plant area, located in Hanwang Town, Mianzhu City, Sichuan Province, 13 kilometers away from Mianzhu City, 42 kilometers away from Deyang City, 110 kilometers away from Chengdu. Deyang plant is located in Deyang City. At present, the expressway from Chengdu to Deyang has been built. There is a first-class highway from Deyang to Hanwang, and there are special railway lines passing through the factory area with convenient transportation. The factory employees 8111 people, of whom 1079 engineering and technical personnel. The whole plant covers an area of 1,360,800 square meters, of which plant covers an area of 803,600 square meters, production construction area of 307,700 square meters. The factory has 2377 main production equipment, of which 136 imported equipment, 46 sets of numerical control equipment. The factory strictly adopts the ISO and IEC international standards and is a national-level measurement enterprise. It has passed the certification of GB / T19001 Quality Assurance Mode of Quality System Design, Development, Production, Installation and Service. It has passed the audit of nuclear power quality assurance system and GEC-AL-STOM quality audits; January 1997 adopted the ASEAN headquarters Guan Guan ASME joint inspection of the plant, has made the ASME “U ” stamp and certificate of authority. After thirty years of unremitting efforts, the power plant steam turbine production capacity has grown from 600MW to 3350MW in 1998. 300MW steam turbine independently developed by the factory has been optimized and improved many times and its performance index is close to international