对于施工企业来说,工程项目造价工作的全过程主要分为投标签约·过程跟踪·竣工结算三个阶段,各个环节互相呼应紧密相关。造价工作进行过程中先行工作要服务到后续环节,后续环节要基于前期工作,且信息的完整性·连贯性需贯穿始末。同时,与技术、现场施工、采购等条线互为经纬,共同编织成工程管理的精美成果。上海市建安区交通枢纽及商业开发项目(以下简称建安枢纽)位于上海市建安区愚园路常德路口,裙楼一~七层,高度37.2m,主楼八~十八层,总高度92.2m,建筑面积12万m2,幕墙总面积约3.5万m2。主要形式为铝塑板幕墙与玻璃幕墙。裙楼框架形式,局部异形双曲、点式幕墙结合;主楼奇特的螺旋上升建筑效果则由半单元玻璃幕墙与铝塑板幕墙构成的装饰条共同完成。整个建筑灵动、斑斓,特别是多达七种色彩的进口铝塑板面材更是彰显了该建筑的精品气质。项目于一零年十月招标,一一年三月(东块)、一一年六月(西块)正式签订合同,本文联系建安枢纽幕墙工程造价控制实例探讨了工程造价工作各环节之间的相互关系及全程跟踪管理的重要性。
For construction enterprises, the whole process of project cost is mainly divided into bidding process, process tracking, completion and settlement of three stages, all aspects of each other closely related. Work in the process of cost-effective work to follow-up to follow-up links, follow-up links based on the previous work, and the integrity of the information, coherence throughout. At the same time, with the technology, on-site construction, procurement and other lines each other latitude and longitude, weaving together into the project management exquisite results. Located in Changde intersection of Yuyuan Road, Jian’an District, Shanghai, Shanghai Jian’an Junction and Commercial Development Project (hereinafter referred to as Jian’an Junction) is located on the first to seventh floors of Podium building, with a height of 37.2m and an eighth floor to the eighth floor with a total height of 92.2m. Construction area of 120,000 m2, curtain wall total area of about 35,000 m2. The main form of aluminum-plastic curtain wall and glass curtain wall. Podium frame form, partial shaped hyperbolic, point curtain wall combination; the main building peculiar spiral rise building effect by the semi-unit glass curtain wall and aluminum panel curtain wall composed of decorative pieces together to complete. The entire building is smart and gorgeous, especially the up to seven colors of imported aluminum-plastic plate surface is the highlight of the building’s boutique temperament. The project tendered in October 2010, one by one in March (East Block), one by one in June (West Block) formally signed a contract, this article contact Jian’an Jiao Curtain wall project cost control case discusses the project cost between the various links The relationship between the entire tracking and management of the importance of.