SPATIAL AND TEMPORAL CHANGES IN THE BRAHMAPUTRA RIVER BED

来源 :International Journal of Sediment Research | 被引量 : 0次 | 上传用户:chaoyuemengxiang2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
A mathematical model based on data for the period 1957-1988 representing changes in space and time in the bed morphology of the 623 km long alluvial reach of the Brahmaputra River in Assam State, India has been developed. This model reveals that in the upper reaches the bed level decreases downstream exponentially with distance from a reference point, while in the lower reaches the exponential decrease is at a smaller rate probably due to differences in tectonic setting. The lower reach is marked by sinusoidal oscillations with a time period of about 9 yr. High runoff in 1977 seems to have caused a significant change as the maximum, average, and minimum bed level were decreasing before 1977 and these increased just after 1977 and then started decreasing at a lower rate than before. Smaller changes in shorter reaches governed by input of discharge and sediment from tributaries are superimposed on the overall degradation/aggradation character. The variation in degradation/aggradation with time is sinusoidal with a wavelength of 4,450 km before 1977 that reduces to about 1,038 km after 1977. A mathematical model based on data for the period 1957-1988 representing changes in space and time in the bed morphology of the 623 km long alluvial reach of the Brahmaputra River in Assam State, India has been developed. This model reveals that in the upper reaches reaches the bed level decreased downstream exponentially with distance from a reference point, while in the lower reaches the exponential decrease is at a smaller rate probably due to differences in tectonic setting. The lower reach is marked by sinusoidal oscillations with a time period of about 9 yr . High runoff in 1977 seems to have caused a significant change as the maximum, average, and minimum bed level were increased before 1977 and these increased just after 1977 and then started decreasing at a lower rate than before. Smaller changes in shorter limited governed by input of discharge and sediment from tributaries are superimposed on the overall degradation / aggradation character. The variation in degradation / aggradation wit h time is sinusoidal with a wavelength of 4,450 km before 1977 that reduces to about 1,038 km after 1977.
其他文献
在今年的巴黎航展上,欧洲主要军用飞机生产商都强烈地表示要共同研制欧洲自己的下一代战斗机,但是英国已被拉入美国的战车,并且它对欧洲其他国家进行隐身技术的封锁一直是欧洲研
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
今年上半年,美空军用“捕食者”无人机成功进行了几次挂载 导弹攻击地面目标的发射飞行试验,目的是想为制定攻击无人机未来作战要求、系统发展和演示计划奠定基础。前不久,他们
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
起重机操作的基本要求是“稳”、“准”、“快”。虽然只有这3个字,但它包含了安全操作的全部要领。要真正达到这个要求,需要长期的领悟与磨练。稳主要是指吊物在运行、就位
我国民用飞机工业的发展又到了生死存亡的关键时刻,如果 再不能抓住机遇,后果将不堪设想,所以我们必须立即停止争论,踏踏实实地进行结构调整,实现强强联合,充分利用现有的资源和体
1 氯碱企业对石棉绒的要求rn 氯碱企业对石棉绒的要求各种各样:有的要求绒长,有的要求绒短,有的要求加工粗糙一些,有的要求加工得越绒状越好,有的要求耐盐水质量波动,有的要求上槽
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥