由中国农机院负责组织联合设计,武汉水泵厂试制的四米大型轴流泵(40CJ95立式全调节轴流泵),1980~1981年在湖北省凡口泵站完成安装任务(共装4台),并投入运行。 1980年凡口泵站遇到了超过设计排涝标准的内涝,三台机组共运行3896小时,排水近9亿米~3。使40万亩农田保收,人民免受水害,其经济效益相当
By the China Agricultural Machinery Institute is responsible for organizing the joint design, Wuhan Pump Factory trial production of four meters large axial flow pump (40CJ95 vertical fully adjustable axial flow pump), 1980-1981 in Hubei Province to complete the installation of the mouth station Fanfan (a total of 4 ), And put into operation. In 1980, Fankou Pumping Station encountered waterlogging that exceeded the designed drainage standards. The three units ran for 3896 hours and nearly 900 million meters of water were discharged. 40 million mu of farmland to protect people from water damage, its economic benefits are quite