针对乐清体育中心体育场索桁架施工过程,对索网体系的组装、牵引、安装、张拉等进行了详细介绍,并对预应力拉索在张拉过程中结构的反应进行了分析,并以此为依据进行了监控,指出施工监控结果与计算理论值较吻合,圆满完成了索桁架施工。
According to the construction process of cable truss of Yueqing Sports Center Stadium, the assembly, traction, installation and tensioning of cable net system are introduced in detail. The response of prestressed cable during tensioning process is analyzed. As the basis for monitoring, pointed out that the construction monitoring results are in line with the calculated theoretical value, successfully completed the cable truss construction.