肃北博伦矿业公司长流水铁选厂计划年产铁精粉20万t,分两个系列三段磨矿。自2005年底建成投产运行约1年半,年产铁精粉仅18万t,品位仅为60%,未达产达标。由于渣浆泵系统存在很多问题,成为制约生产的瓶颈,所以该选厂对渣浆泵系统进行了改造。
Subei Boren Mining Company long flowing iron processing plant plans with an annual output of 200,000 t fine iron powder, divided into two series of three sections of grinding. Since the end of 2005 completed and put into operation about 1 and a half years, with an annual output of only 180,000 t iron powder, grade is only 60%, did not meet production standards. Due to the slurry pump system has many problems, as a bottleneck restricting production, so the election plant on the slurry pump system has been transformed.