钢筋混凝土烟囱滑模施工中,安装信号平台的三角支架以往多是在烟囱混凝土筒壁上预埋上下两排暗榫,待暗榫全部出模并离开滑升操作平台外吊架底层后,再安装信号平台的三角支架。此法在安装中操作者完全处于悬空作业,既不安全,劳动强度又大,安装速度慢,同时还影响滑模施工的正常滑升。我单位在湖南韶峰水泥厂钢筋混凝土烟囱滑模施工中,采用了信号平台三角支架倒装法安装施工,较好地解决了这个问题。一、施工准备按施工图把三角支架制作好,刷防锈漆,运到滑模施工用的滑升操作平台上。二、施工方法
In the construction of reinforced concrete chimney slipforms, the triangular supports for the signal platform used to be pre-embedded in the upper and lower rows of concrete linings on the chimney concrete wall. After all the molds have been ejected and left the bottom of the pylon outside the sliding platform, Mount the triangular platform for the signal platform. In this installation, the operator is completely suspended, and it is neither safe nor labor-intensive, and the installation speed is slow. At the same time, it also affects the normal sliding of the sliding mode construction. During the construction of the reinforced concrete chimney slipform at the Yufeng Cement Plant in Hunan, our company adopted a signal platform trigonometric stand flip-type installation method to solve this problem. First, the construction preparation According to the construction plans to make a good triangular stent, brush anti-rust paint, shipped to sliding mode construction with the sliding platform. Second, the construction method