论文部分内容阅读
本文从鲁布革堆石坝施工和运行期实测沉降出发,利用心墙内部分层沉降以及沿坝轴线方向表面沉降的分布和发展规律,提出了一种估算漏测沉降的新方法。讨论了它与原有方法的关系,并利用这种方法得到了鲁布革堆石坝心墙顶部具有良好分布规律的沉降曲线。
Based on the measured settlement during the construction and operation of the Lubuge rockfill dam, a new method to estimate the leak detection settlement is proposed based on the distribution and development of the subsidence inside the core wall and the settlement along the axis of the dam. The relationship between this method and the original method is discussed. By using this method, the settlement curve with good distribution at the top of the core wall of the Rubble rockfill dam is obtained.