水力发电原本属于低成本、高效益的产业。可是,在现实经济生活中也有债台高筑的水电站。石家庄市小水电系统就曾有过一批这样的小水电站,人称这样的电站是“自己往自己脖子上套枷锁。” 枷锁是怎样形成的 石家庄市小水电系统共有小水电站38座,除1座是1948年由边区人民政府创建外,其它都是新中国成立后陆续建成的,共装机71台,总容量22785千瓦。这些小水电站多数分布在太行山东麓的平山、
Hydroelectric power was originally a low-cost, high-efficiency industry. However, in real economic life, there are also hydropower stations with high debt. The Shijiazhuang small hydropower system once had a group of such small hydropower stations. People call this kind of power station a “self-locking yoke on their own necks.” How the shackles are formed The Shijiazhuang small hydropower system has 38 small hydropower stations in total, with the exception of one. It was founded by the People’s Government of the Border Region in 1948. The rest were built after the founding of the People’s Republic of China. There were a total of 71 units with a total capacity of 22785 kW. Most of these small hydropower plants are located in Pingshan, which is located in the eastern foothills of the Taihang Mountains.