今年上级分配我局冬季施工的工程有重型机器厂等四个单位的七万余平方米,其中有:厂房、地下室、办公楼、家属宿舍楼、锅炉房、水泵房、烟囱工程等。这些工程技术一般比较复杂,如有的工房是辐度很大的钢铁结构工程,有的地下室必须在地下水以下进行操作,而烟囱则是在高达四十公尺的空中进行建筑。在气候寒冷,技术力量不足的条件下,困难是很多的。为了解决这些问题,除已派出一批技术干部有重点的具体帮助解决有关技术方面存在的问题,并已指示各公司、工地及早准备各项工作,本局负责同志于十一月中旬更深入各施工现场进行了比较全面的检查,兹将具体情况报告如下:(一)准备工作进行情况
This year, our bureau allocated more than 70,000 square meters of four units, including the Heavy Machinery Factory, for the winter construction of our bureau. Among them are: factory buildings, basements, office buildings, dormitory buildings, boiler rooms, pump houses and chimney projects. These engineering techniques are generally more complicated. For example, some workshops are steeply constructed steel structures. Some basements must be operated below groundwater while the chimneys are constructed in the air up to 40 meters. In the cold climate, lack of technical conditions, the difficulties are many. In order to solve these problems, apart from the fact that a number of technical cadres have been dispatched to give concrete help in solving the technical problems and various companies and construction sites have been instructed to prepare all kinds of work as early as possible, the responsible comrades of this Council will conduct further work in mid-November The site conducted a more comprehensive inspection, the specific situation will be reported as follows: (A) the preparatory work for the situation