论文部分内容阅读
胜利矿洗煤厂是在1973年7月扩建竣工投产的,投产后不久生产能力即达到设计水平。但是出于采用重介系统的磁选尾矿、浮选尾矿、过量循环水和事故放水等均排出厂外的煤泥水流程,因此,投产不到二年时间出厂煤泥量已达13万多吨,占全厂入选原煤量的5%左右。根据煤炭工业部有关保护环境防止污染长远规划的要求和今年年初召开的煤泥
Shengli Coal Washery was completed and put into production in July 1973, and its production capacity reached the design level shortly after it was put into production. However, due to the use of HM system tailings, flotation tailings, excessive circulating water and accidental discharge of water are discharged outside the slime water process, therefore, put into operation less than two years the amount of the factory slime has reached 130,000 More tons, accounting for about 5% of the selected coal plant. According to the requirements of the coal industry ministry on long-term plans for environmental protection and prevention of pollution and coal slime held earlier this year