文章通过板桥水库复建工程主副坝土料填筑、砂壳填筑及老坝坝面削坡、及南北裹头块石填筑等。在严格的质量检测和管理下,进行了平行检测、跟踪检测。经检测符合设计要求,确保了工程质量,加快了施工进度,并按期完成了工程任务,至今大坝运行良好。
The article through the Banqiao Reservoir Reconstruction Project main and auxiliary dam material filling, filling the sand shell and the old dam surface slope, and the South and the South wrapped head stone filling. In the strict quality testing and management, conducted a parallel test, follow-up testing. The test meets the design requirements to ensure the quality of the project, speed up the construction progress, and completed the project tasks on schedule, so far the dam is running well.