新消防设计规范《消防给水及消火栓系统技术规范》(GB50974-2014)及《建筑设计防火规范》(GB50016-2014)分别于2014年10月1日及2015年5月1日实施,原消防设计规范《高层民用建筑设计防火规范》(GB50045-95)2005年版(以下简称<高规>)相应作废。现阶段有许多类似在此之前通过消防设计审批的工程,均未达到现有规范要求,且工程未竣工验收,虽然在行政审批上不受影响,但若能优化改善,对提高消防系统安全性有极大帮助。以江门市摩根国际消防系统为例,针对新规范要求较严格的水灭火系统的水泵选型、停泵水锤影响、消火栓系统及自动喷淋灭火系统设计等问题,提出了更加合理优化的设置。
New Fire Design Code “fire water and fire hydrant system Technical Specifications” (GB50974-2014) and “Fire Code for Building Design” (GB50016-2014) were implemented on October 1, 2014 and May 1, 2015, the original fire protection design The norms “fire protection design of tall buildings” (GB50045-95) 2005 edition (hereinafter referred to as “high regulation”) corresponding void. At this stage, there are many similar projects that have been approved by the fire protection design before. They all fail to meet the requirements of existing norms and the project has not been completed and accepted. Although it is not affected by administrative examination and approval, if it can be optimized and improved, Great help. Taking Jiangmen Morgan International Fire-fighting System as an example, aiming at the problems of water pump selection, water hammering effect, fire hydrant system and automatic sprinkler system design of the more stringent water control system in the new code, a more reasonable and optimized setting .