电网黑启动是指整个电网(或局部电网)系统因故障停运后,通过系统中具有自启动能力的发电机组的启动,逐渐扩大系统恢复供电范围,最终实现整个系统供电的恢复。水电机组因其启动快速灵活的特点,被作为电网黑启动的主力。但由于各水电厂实际情况不同,在黑启动方式、黑启动时间、风险控制、调节品质、应急预案等方面均存在一些问题,本文在不同类型水电厂现场试验及资料分析的基础上,对此类问题作出分析,为后续解决方案提供技术参考。
Black start of the grid refers to the entire grid (or partial grid) system outage due to the failure, through the start-up of the system with self-starting power generation, and gradually expand the scope of the system to restore power supply, and ultimately to restore the power supply of the entire system. Hydropower units because of its fast and flexible start features, as the main black start grid. However, due to the different actual conditions of hydropower plants, there are some problems in black-start mode, black-start time, risk control, regulation quality and contingency plans. Based on field tests and data analysis of different types of hydropower plants, Class problems to analyze, provide technical reference for follow-up solution.