论文部分内容阅读
人防地下室工程检查中发现给水管、电线管、通风管在外墙、隔墙、顶板等处存在预埋或安装错误,本文通过对照人防设计规范、验收规范及国家有关标准图集,分析这些错误做法给人防工程带来的危害,提出个人意见及整改措施,希望引起设计人员、施工人员的重视。
Civilian air basement engineering inspection found that water pipes, electrical conduit, ventilation pipe in the external walls, partitions, roofs, etc. there are embedded or installation errors, this article by comparing civil air defense design specifications, acceptance criteria and national standards atlas, analysis of these erroneous practices The harm to the civil air defense project, put forward personal opinions and corrective measures, hoping to arouse the attention of designers, construction workers.