论文部分内容阅读
“八五”期间,厦门玻璃厂投资614万元,增购设备207台套,使设备新度系数达到0.6。其中投资292万元引进彩棒生产线,填补了国内这一项目的空白。尔后又自己设计、施工属国内首创的乳白料换热室双炉盖小池窑拉管线,与坩埚窑生产线相比,吨制品节能49%,制造成本下降20%左右。以后又投资163万元更新三台QD6A行列式制瓶机及一座电加热退火炉,生产能力提高45%,开发了50多种新品种,不仅稳住了老客户,又赢得了新用户。在此基础上企业再次进行节能改造,投入200
During the “Eighth Five-Year Plan” period, the Xiamen Glass Plant invested 6.14 million yuan and purchased 207 sets of equipment, so that the new coefficient of equipment reached 0.6. The investment of 2.92 million yuan in the introduction of color stick production line, to fill the gap in the domestic project. Afterwards, it also designed and constructed its own dual-roofed small tank-kiln puller pipeline, which is the first in China. Compared with the thorium kiln production line, the energy savings per ton product is 49%, and the manufacturing cost is reduced by about 20%. Afterwards, it invested RMB 1.63 million to update three QD6A serial-type bottle-making machines and an electric heating annealing furnace. The production capacity increased by 45% and more than 50 new varieties were developed, which not only stabilized old customers but also won new users. On this basis, the company will again carry out energy-saving reforms and invest 200