根据引进合同规定,在试生产期间要对引进设备进行技术性能考核。列入技术性能考核的指标共计40项(其中日本32项,芬兰8项),其核心是按设计的闪速炉投料量使干燥窑、闪速炉、贫化电炉、转炉、阳极炉、余热发电和硫酸设备均处于满负荷状态下,以便使设备问
According to the provisions of the introduction of the contract, during the trial production of imported equipment to conduct technical performance appraisal. A total of 40 items (including 32 in Japan and 8 in Finland) are included in the index of technical performance appraisal. The core of the project is to set the kiln, flash furnace, depleted electric furnace, converter, anode furnace, waste heat Power generation and sulfuric acid equipment are at full capacity in order to make the device asked