1985~1992年,三峡工程库区移民进行搬迁安置试点。1989年,长江水利委员会重新编制《长江三峡水利枢纽可行性研究报告》,设计坝高为185米,蓄水位为175米。1992年4月3日,七届全国人大五次会议以1767票赞成、177票反对、664票弃权、25人未按表决器通过《关于兴建长江三峡工程的决议》。据设计方案,三峡工程实行“一级开发,一次建成,分期蓄水,连续移民”;以1985年数据统计,淹没区人口72.6万人,推算到2008年,规划迁建安置的总人数为
From 1985 to 1992, resettlers of the Three Gorges Reservoir Area were relocated and piloted. In 1989, the Yangtze River Water Resources Commission re-compiled the “Three Gorges Water Control Project feasibility study report”, the design dam height of 185 meters, the water level of 175 meters. On April 3, 1992, the Fifth Plenary Session of the Seventh National People’s Congress adopted 1,767 votes in favor, with 177 votes against and 664 abstentions. Twenty-five members, however, did not pass the resolution on the construction of the Three Gorges Project in the Yangtze River. According to the design plan, the Three Gorges Project will carry out “one-level development, once-built, phased water storage and continuous resettlement”. According to the statistics of 1985, the population of the inundated area is 726,000, and it is estimated that by 2008, the total number of resettlement for