对南水北调西线工程调水入黄后黄河干流梯级工程的调蓄能力进行了分析。分析结果表明,南水北调西线工程不同方案的调水量入黄后,黄河干流龙羊峡以下梯级水库通过挖掘潜力,有能力对调入水量进行调蓄。在调水量达到一定程度,确需新增调蓄工程时,龙羊峡以上河段有新增调蓄工程的条件和可能。
After the water diverted into the Yellow River from the west route of the South-to-North Water Diversion Project, the ability of regulating and apportioning the cascade works of the Yellow River trunk was analyzed. The results of the analysis show that after the water diversion plan of the West Route Project of the South-to-North Water Diversion Project has entered the Yellow River, the cascade reservoirs below the Longyangxia Dam of the Yellow River will have the potential to excavate the transferred water. When the volume of water transfer reaches a certain level and it is really necessary to add new storage and storage projects, the condition and possibility of the additional storage and storage works in the section above Longyangxia can be achieved.