石门电站加箍岔管研制中的几个问题

来源 :三峡大学学报(自然科学版) | 被引量 : 0次 | 上传用户:yanlei3352
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
前言陕西石门电站的引水系统包括进水塔、引水隧洞、压力钢管及岔管等部分.最初,岔管按钢筋混凝土管设计,内部衬以钢制岔管防渗.钢制岔管的主管直径4.5米、支管直径2.8米;主、支管轴线夹角60°,采用厚度为16毫米的A _3F钢板制做.工作静水压力及水击时的压力分别为6公斤/厘米~2及10公斤/厘米~2. Introduction The water diversion system of Shimen Power Station in Shaanxi Province includes intake towers, diversion tunnels, pressure pipes and bifurcated pipes etc. Initially, the bifurcated pipes are designed according to reinforced concrete pipes and lined with steel bifurcation pipes to prevent seepage.The diameter of the steel bifurcation pipe 4.5 meters, branch diameter 2.8 meters; main, branch axis angle of 60 °, the thickness of 16 mm A _3F steel plate made of work hydrostatic pressure and water hammer pressure were 6 kg / cm ~ 2 and 10 kg / Cm ~ 2.
其他文献
Objective Exploring the feasibility of the 2014 European Society of Cardiology(ESC)guideline’s risk prediction model for sudden cardiac death in hypertrophic c
武冈县长塘水库1955年建成,当年发挥效益。从一开始水库管理委员会就本着“自力更生、以库养库”的方针开始征收水费,发展副业。十年来,共征收水费1.4万元,副业收入4,600多
珠委于去年10月召开珠江流域规划协作会议以后,即积极组织力量,调查收集各江有关资料,为现场查勘做好准备。最近,委本部及西江局领导,已先后亲自领队,对西江、北江、郁江及柳
福建省晋江县广井水库,是个库容18万立方米的小水库,1958年建成,1959年开始受益,从1960起,就开始实行按方收水费。四年来,灌区不但迅速地扭转用水管理紊乱、水费负担不合理
蓄电池严重亏电,其电压不能使点火系统产生足够强度的火花时,汽油机不能着火.此时若想起动汽油机,可以外接电源,俗称“借电”.根据汽车所处的环境,可以利用其它车辆的电源,也
《水力发电》是电力工业部主办的全国水电建设的综合性技术月刊,每月12日出版。本刊主要内容包括大、中型水电站的勘测、规划、设计、施工、机电、运行管理等方面的技术经验
目前汛期卽將到來,各級治淮政治部門,應以保證防汛任務的勝利完成,爲當前的政治工作中心,切實地做好汛期前的各項準備工作,充分地認識防汛工作是一個羣衆性、戰鬥性、突擊性
建国15年是治理海河取得光辉成就的15年,是海河发生大变革的15年。解放以来,特别是大跃进以来,河北省人民在党的领导下,高举总路线、大跃进、人民公社三面红旗,艰苦奋战,兴
为加速搜集珠江出海口门和近海水域的勘测资料,以促进珠江流域的开发和整治,在有关部门的关怀和帮助下,我委勘测总队最近购进了一套美国MRS—Ⅲ型小型自动测距定位系统。该
改造型完井液在文东地区应用李美格苗秀花(中原石油局科技开发中心钻井泥浆所,457001河南濮阳)文东地区的文203及文13西断块地层为新生代陆相砂泥岩和盐岩沉积,储油气岩层为下第三系砂河街