为保证主桥施工期间的质量和安全,积累设计、要施工技术资料,同时也为今后科研积累科学数据,进行施工控制是很有必要的。因而针对斜拉桥上部结构施工方案总体:满堂支架立模分步现浇主梁及索塔,集中安装并张拉斜拉索,探讨施工控制的组织体系及方法。拟定施工控制实施方案,可有计划、有步骤、科学地进行施工控制工作。
In order to ensure the quality and safety during the construction of the main bridge, it is necessary to accumulate design, construct technical data and accumulate scientific data for future scientific research and construction control. Therefore, for the construction of the superstructure of the cable-stayed bridge, the overall construction scheme is as follows: a full-scale stand-up step-by-step cast-in-place main girder and a pylon are installed, and the installation and tensioning of stay cables are focused on to discuss the organizational system and method of construction control. Proposed implementation of construction control program, there may be a planned, step by step, the construction of scientific control work.