某大酒店表演大厅500平米,音响工程首期投入150万元人民币,但由于工程设计布局不合理,调试不到位,致使效果始终不理想,后来对整个音响工程进行整改,才达到了满意的效果。 一、音箱布局改造 我们对现场及原设备进行了认真细致的考察,发现原有设备档次不低,配置并
A large hotel performance hall 500 square meters, the first phase of acoustic project invested 1.5 million yuan, but due to unreasonable layout of the engineering design, debugging is not in place, resulting in the effect is always unsatisfactory, and later on the entire sound engineering rectification, only to achieve satisfactory results . First, the speaker layout transformation We conducted a careful study of the site and the original equipment, found that the original equipment is not low grade, configuration and