论文部分内容阅读
随着沂沭泗河洪水东调南下工程的规划与实施,韩庄运河总体防洪标准由原来的20年一遇提高到50年一遇,不仅改变了工程防洪标准,也使工程的管理条件发生了相应的变化。标准化堤防建设是“确保工程安全运行,维护河湖健康生命”的具体表现,随着水管体制及运行机制的逐步完善和健全,对工程管理建设提出了新的要求,逐步理顺管养关系,搞好堤防工程维修养护,大力推动标准化堤防建设,才能进一步改善工程面貌,充分发挥水
With the planning and implementation of the Yishusi River flood diversion southward project, the overall flood control standards for the Hanzhuang Canal increased from once every 20 years to once in 50 years, which not only changed the flood control standards of the project, but also made the management conditions of the project happen The corresponding changes. Standardization of embankment construction is the concrete manifestation of “ensuring the safe operation of the project and safeguarding the healthy life of rivers and lakes”. With the gradual improvement and improvement of the water pipe system and operating mechanism, new requirements have been put forward for project management and construction, Relationship, do a good job dike maintenance and repair, and vigorously promote the construction of standardized dikes in order to further improve the project, give full play to the water