一基本情况 (一)建筑物基本情况那板电站位于广西左江支流——明江上游上思县(?)。六十年代初期迪成大坝与溢洪辺,1972年迪成1号机组。1974年6月开始扩迪2、3、4号机组厂房及其引水系统,1977年12月造成并网投产。电站装机容量4台共12,600千瓦。新迠的引水系统是一个供发电和在特殊恃况下放空水库两用的元形有压隧洞。全长432.5
A basic situation (a) the basic situation of the building that board station is located in Guangxi Zuojiang tributary - upper Mingjiang Shangsi (?). Dicheng Dam and Spillway in the early 1960s, Di Cheng Unit 1 in 1972. In June 1974, Dian 2,3,4 and its diversion system began to be expanded. In December 1977, it was put into operation. Power station installed capacity of 4 units a total of 12,600 kilowatts. The new water system is a diversion tunnel for generating electricity and reservoirs under special circumstances to save the dual-use of the pressure of the tunnel. Full length 432.5