论文部分内容阅读
本工程项目为某市第一城三期4#楼,标准层24层框架结构,本论文设计包括以下两个内容:第一部分为施工组织设计内容,主要包括编制依据、编制范围、工程概况、施工方案、总工期以及进度计划和资金安排、施工材料和工程设备的使用和供应计划安排、创优规划和质量保证措施、安全保证措施、工期保证措施、环保、水保、文物保护措施、后附图表。第二部分为估计分析内容,主要内容为工程量计算和工程估价编制。工程估价按照建筑与装饰工程造价编制。
This project is a 24-story building with standard floor and 4 floors in the first phase of the city. The design of the dissertation includes the following two contents: The first part is the design content of the construction organization, including the preparation basis, the preparation scope, the project overview, Construction plan, total construction period and schedule and funding arrangement, construction material and engineering equipment use and supply plan arrangement, excellent planning and quality assurance measures, safety assurance measures, construction period guarantee measures, environmental protection, water conservation and cultural relic protection measures The chart. The second part is the content of the estimation and analysis, the main contents of which are engineering quantity calculation and project valuation. Project valuation in accordance with the construction and decoration costs.