Integrated real-time roof monitoring

来源 :煤炭学报(英文版) | 被引量 : 0次 | 上传用户:ALF123456
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
CSIRO has recently developed a real-time roof monitoring system for under-ground coal mines and successfully tried the system in gate roads at Ulan Mine. The sys-tem integrated displacement monitoring, stress monitoring and seismic monitoring in one package. It included GEL multianchor extensometers, vibrating wire uniaxial stress meters, ESG seismic monitoring system with microseismic sensors and high-frequency AE sen-sors. The monitoring system automated and the data can be automatically collected by a central computer located in an underground nonhazardous area. The data are then trans-ferred to the surface via an optical fiber cable. The real-time data were accessed at any location with an Internet connection. The trials of the system in two tailgates at Ulan Mine demonstrate that the system is effective for monitoring the behavior and stability of read-ways during Iongwall mining. The continuous roof displacement/stress data show clear precursors of roof falls. The seismic data (event count and locations) provide insights into the roof failure process during roof fall.
其他文献
According to the different engineering mechanical states of top coal caving and normal stoping of gaseous loose thick coal seams, the dialectical relation between this caving method and dynamic disasters was analyzed by simulating the change of stress sta
Gas drainage in Jincheng Mining Group Co., Ltd. was introduced briefly and the importance of gas drainage in gas control was analyzed. Combined with coal-bed gas oc-currence and gas emission, the double system of gas drainage was optimized and a pro-gress
Taking the Xinhe mine\'s structure, mine pressure, structural fissure, fault and fault displacement, the distance between fault and water inrush point, thickness of block,water pressure those geological factors which influenced the water inrush as the i
Based on the movement regularity of surrounding rock with road-in packing of gob-side entry retaining in fully-mechanized sub-level caving face (RPGERFCF), the me-chanical model of its surrounding rock was established and the calculating formulas of the d
Focused upon the dynamic changing regularity and tendency of overburden movement and bed separation developing during the strip mining and stoping under rail-ways were simulated by ANSYS model. The results show that movement and rheology developing of key
As a good method to solve the problem of high methane on the workface and in the goaf, drawing coal strata methane through a surface borehole is used. However, the excavation affected the overlying rock strata greatly. When the excavation face passed thro
In order to improve the thermal environment of high-temperature heading face,moisture content of supply air is reduced by dehumidification, and the relative humidity of environment air of the heading face is also decreased. First, according to the coeffic
Through discussion of the time-distance curve characteristics of the direct wave and from the front, side and rear of the reflection waves of the seismic reflection method for advanced exploration in mines, and analysis of several major interference waves
Analyzed the situations and characteristics of thin coal seam mining and its mining technologies, and introduced the mining innovation technology used by Tianchen Coal Mine of Zhaozhuang Coal Company of China. This innovation technology combined the fully