改造沙田水电站接入电网方式的效益分析

来源 :水力发电 | 被引量 : 0次 | 上传用户:mhouwen
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
沙田水电站(原名花木桥水电站)装机容量3×1.8万kW,经一条110kV、长323km的花茶醴株线接入系统。鉴于线路损耗大、运行性能差,若干年前曾提出过架设沙郴线的并网方案;但由于投资排不上号,方案不能实施,致使沙田水电站在不合理的并网方式下运行,直至今日。为此,特就沙田水电站目前并网方式的不合理性和架设沙郴线后的运行性能、经济效益进行剖析,以便引起有关方面的重视。 Shatin Hydropower Station (formerly known as Huamuqiao Hydropower Station) installed capacity of 3 × 18000 kW, through a 110kV, 323km long Hua Cha liu line access system. In view of the high loss of lines and the poor performance of operation, a grid-connection plan for erecting sand lines has been proposed some years ago. However, due to the lack of investment, the scheme can not be implemented and Shatin hydropower stations operate under an unreasonable grid-connected mode today. To this end, we analyzed the irrationality of Shatian Hydropower Station’s current grid connection and the operational performance and economic benefits after the Shamian line was erected to attract the attention of relevant parties.
其他文献
水电部颁发的《电力建设施工及验收技术规范》明确规定:水轮发电机转子磁轭铁片迭装前应对铁片进行过称、分类和配重。对于大、中型水轮发电机来说,转子磁轭铁片的数目在数
1985年11月18日至21日,江苏省水利学会在苏州召开“大型泵站技术改造、工程管理、中低水头工程水力学”学术讨论会,会上共讨论交流了26篇论文,中低水头工程水力学部分论文计1
福建省闽清县昌溪水库为粘土心墙堆石坝,最大坝高45米,总库容量650万方米。坝址河谷呈“V”型,底宽约20米,两岸陡峻,比较对称。坝基为上侏罗统长林组凝灰质中粒长石石英砂岩
通过学习汉语言文学,可以深入的了解和掌握我国的传统文化,也是研究我国传统文化的重要途径之一,由此可见,在职业院校中开展汉语言文学教学和实践,具有重要的意义。应用性的
电液转换器是调速器的核心,它的性能直接影响调速器的指标。目前,国内多数电液转换器动特性及抗油污能力较差,因此常常引起电液转换器发卡或前置级堵塞,导致机组失控。以我
1984年汛期,黄河下游花园口水量较常年偏多25%,达338亿立米;沙量较常年偏少30%,有7.4亿吨,最大洪峰流量6900米~3/秒。由于水丰沙枯,造成三门峡库区和下游河道略有冲刷。 In
请下载后查看,本文暂不支持在线获取查看简介。Fas、FasL、bcl-2与NHL组织坏死的相关性$遵义医学院病理教研室!563003现就职于中国人民解放军空军总医院(北京100036)@李德昌$
世界语言大会展示馆·语言文化研习体验馆开馆活动6月15日在苏州举行。建设世界语言大会展示馆·语言文化研习体验馆,是2014年3月习近平主席访问联合国教科文组织后续成果世
掘进机是开挖隧洞的有效机械,在我国生产使用已有20多年的历史了,但累计进尺却只有10多公里.影响掘进机使用的原因有很多,而如何使掘进机有效地进入工作面,则 Tunnel borin
格拉兰德二级电站由多米宁工程公司供货的第一台机组,投入运行后3000小时就发现了严重的汽蚀问题。经几次对原型机组进行修正无效,为了尽快解决问题,进行了一系列模型试验。